Water catchment: phase 1, day 2

1 06 2021

If you missed yesterday’s post, a brief recap: I’m telling the story of the first phase of the building of the first of Spring Creek Basin’s two new water catchments. In this first phase, don’t think building UP so much as digging DOWN (the up-ness will come in phase 2). There were some holes to dig before the pretty stuff – the water tanks – could be placed, and the tanks had to be placed before the moisture-gathering roof can be built.

Day 2 started with more digging of the holes. Though they measured side to side and other side to other side, to contain the roundness of the big tanks, because of the crumbliness (that’s a highly technical term in the world of dirt-hole digging) of the dry dirt, they really had to overdig, and the middle two holes eventually became one rectangular hole. Daniel is at the controls of the mini-ex, and Jim has the laser level “stick.” (For the first half of this day, Mike was meeting another group at another range site, and Garth had the day off to attend the graduation of his kindergartner!)

In the afternoon, Mike arrived with Tres Rios Field Office Manager Connie Clementson and BLM employee Whitney Carnahan (I knew her when she was a seasonal and don’t know her married name) to show off and explain the project. Daniel and Jim were just about to use the excavator to pick up the first water tank and lower it into the first hole.

Daniel and Jim finagled a way to strap the tank through the holes in the top in order to lift it with the excavator. Destination: hole in the foreground.

Once again, we had Jim in the hole (inside joke) while he steadied the tank and Mike directed Daniel. Jim’s left hand is on the lower valve opening, and straight above that is the top valve opening. There’s a much bigger hole on top of the tank (which has a screw-top lid), and those were the holes the guys used to run the strap through and lift the big bugger. Those valves also had to “face front” to align with the pipe-’em-all-together pipe that would run across the “front” of the tanks, then down to the trough.

Because of the off-center location of the top holes, though, it was hard to get the trough quite settled in the hole.

This was kinda when they realized the holes needed to be a wee bit bigger to accommodate the dirt crumbliness. I also want to point out Daniel at lower right: he dug little entrance/exit ramps into the holes for easy(er) access. As it turned out, he ended up digging the holes out a fair bit bigger for really good access, which they needed in order to align the tanks with the valve holes in the right spots after they dropped the tanks into the holes.

Tomorrow (which is to say that day’s tomorrow), they used the UTV to drag out the tank to enlarge the hole (along with the other holes) and commenced the dropping of the tanks!





Water catchment: phase 1, day 1

31 05 2021

First, let me refresh your collective memories:

Last year, Spring Creek Basin Herd Management Area herd manager (and all-around great guy) Mike Jensen put the finishing touches on the new, updated herd management area plan (updated from 1994!) that he worked on for two years. If you follow that time-machine link back to July 2020, you’ll see that Tres Rios Field Office Manager Connie Clementson’s decision included eight items. No. 8 was to authorize “additional new water developments for improving wild horse distribution across the HMA.”

We had hoped to start the first catchment last fall, but Mother Nature had other ideas for the week Mike had rented the machine to do the digging. And as winter approached, the project got pushed to this spring.

Fast forward to this spring (which was two weeks ago!), our BLM dream-range-team of Mike, Garth Nelson (also a rangeland management specialist), Daniel Chavez (range tech) and seasonal weed sprayer Jim Cisco broke ground on phase 1 of the first of two new water catchments in Spring Creek Basin.

This week on the blog will be devoted to the progression of the project. So today’s photos depict that Monday’s work; Tuesday’s post will depict that Tuesday’s work, etc.

On to the dirt work!

Daniel, the youngest of our range team, ran the mini excavator to dig holes for four 3,500-gallon poly (heavy plastic) water tanks while Mike and Garth used an augur to drill holes for the support posts for the roof system that will go over the tanks to catch rainwater and snow.

While the digging was under way, Jim readied the laser level in order to ensure the holes are all at the same depth. Then he used it to measure the run down to the eventual location of the water trough. That laser level got a workout (as did Jim) during the week. Garth would give Daniel breaks from running the mini-ex. Like Daniel said, it was a bit dizzying to scoop (to dig) and swing (to deposit). Here’s a sad thing: They dug down about 4 feet to bury the tanks about halfway, and the dirt is dry, dry, dry, all the way down.

Here’s a closeup of Garth and Mike using an augur to drill holes for the support posts for the roof over the tanks.

As it turned out, they decided on different locations for the posts to stand, but these first holes gave us the straight line on which to align the tank holes. Another sad note: Garth later used a post-hole digger to clean out the holes … and the dirt was SO dry, it all just slid right out of the digger’s “jaws.” (Also of note, of all tools in existence, I despise post-hole diggers the most!)

Did I mention the laser level? They used it to ensure that all the tanks were buried to the same depth and were level, and they also had to make sure there was enough “drop” down the slope (which doesn’t look like much of a slope, does it?) so gravity will do the work of allowing water to flow from the tanks (even when the water level is low) to the trough. As with our other two troughs, there will be a float to keep the water level constant. And the guys also will add an evaporation cover. In the pic is Jim, master of the laser level.

Zoom in on this pic. See Mike? See Mike smiling? He’s measuring out the distance from the tanks to the trough location. Mike is always smiling! 🙂

Mark it! This will be the basic location of the trough, and this perspective is looking back up toward the tanks. You can see the first one that we delivered on the flatbed trailer behind it. Also, see the white thing behind the truck cab? That’s a 200-gallon water tank (the truck is Jim’s weed-spraying rig), and the guys filled it with water each day before they left Dolores, and each day, we emptied it to one of the aprons at the main (and original) catchment, for a total of 800 gallons! (Friday, Ma Nature graced us with rain, so there was no work that day, and she provided the water!)

Tomorrow: A bit more digging, a bit more leveling, and the holes will be ready for the tanks!

**********

Also today, Memorial Day, we remember all those members of the U.S. Armed Forces who died in service to their country. Though they did not make it home to family and loved ones, their service and sacrifice cannot be forgotten by those of us *at* home, for whom they fought and died.





Teamwork

30 05 2021

I love this pic of our guys working together to push a water tank into a hole dug last week in Spring Creek Basin!

This was part of phase one of the first of two new water-catchment projects for the mustangs: digging holes for tanks, digging trenches for pipes, placing the tanks in the holes, placing and putting together the valves and pipes in the trenches (including down to the eventual trough). Next up: auguring holes and setting the supports for the roof over the tanks that will funnel rain and snow. (I really do have hopes of doing at least a brief post about phase one …!)

Left to right above: Mike Jensen, Garth Nelson, Daniel Chavez and Jim Cisco – excellent BLM’ers all!





What are they up to out there?

22 05 2021
(BLM rangeland management specialist Garth Nelson pushes dirt into a trench laid with pipe from the water tanks while herd manager Mike Jensen, range tech Daniel Chavez and seasonal weed-sprayer Jim Cisco shovel dirt into the trench along the “front” of the tanks to cover the pipe. A roof with a gutter will pipe rainwater/snow into the tanks, and the pipe in the trench directly in front of me as I take this pic will run water to the trough, which will be on a float.)

We’ve had some big doin’s out in Spring Creek Basin recently.

Remember when our BLM folks (herd manager Mike Jensen and Tres Rios Field Office Manager Connie Clementson) updated our herd management area plan last year? Remember the two new water catchments that were proposed (and approved) in that EA?

Our first tanks for the first of those water catchments are in the ground. 🙂 That’s phase one of the project; phase two is coming. It will take me a bit to consolidate several days of work into a nice little post to detail their work. That’s coming, too. But just in case you wondered what the heck our BLM guys are doing out in Spring Creek Basin these days … this is a bit of an answer. 🙂

And in best of all news, we actually got a decent drizzle of rain in Disappointment Valley yesterday! No, the catchment isn’t at the point of catching that rain, but soon. … Hopefully very, very soon … !

**********

If you’re in Norwood, Colorado, this evening, join us at The Livery (1555 Lucerne St.) for Kat Wilder’s first in-person reading to celebrate the publication of her memoir, “Desert Chrome”! Folks will start to gather around 6 p.m. Bring your own camp chair, picnic and beverage for an outdoor gathering. San Miguel County and Colorado state Covid protocols will be followed.





Signed

22 07 2020

Thank goodness for our abundance of greasewood, which makes things look green in the basin. 🙂

We have a good-looking forecast, starting today!

All the documents for the Spring Creek Basin Herd Management Area Plan – signed! – now are on BLM’s ePlanning site.

From the final document:

Background: The 2015 RMP directed BLM to revise and update the 1994 Spring Creek Basin HMAP. This updated analysis and plan will incorporate specific goals, objectives, and techniques for guiding the long-term management of wild horses within the HMA consistent with the resource direction contained in the new RMP.

Decision: I have decided to select Alternative A, the Proposed Action for implementation as described in the Spring Creek Basin Herd Management Area Plan (HMAP) Revision (DOI-BLM-CO-S010-2020-0009-EA). Based on my review of the Environmental Assessment (EA) and project record, I have concluded that the Proposed Action was analyzed in sufficient detail to allow me to make an informed decision. This decision 1) establishes an Appropriate Management Level (AML) of 50 to 80 adult wild horses that is in balance with the ecosystem and available forage; 2) implements the use of BLM approved fertility control measures to slow the annual rate of growth of the wild horse herd; 3) establishes monitoring criteria for initiating the removal of excess wild horses; 4) utilizes bait trapping as the preferred removal technique; 5) maintains genetic viability expressed as observed heterozygosity within the wild horse herd by periodically introducing outside horses from other similar herd management areas; 6) manages the wild horse herd to achieve a diverse age class and natural sex ratio; 7) establishes vegetation monitoring objectives for maintaining good ecological and forage conditions; and 8) authorizes additional new water developments for improving wild horse distribution across the HMA.

Overall, implementation of this decision will provide long-term management guidance for sustaining a healthy wild horse herd in balance with the ecosystem, while ensuring that Public Land Health Standards developed for Colorado are being achieved.





Because … this.

21 07 2020

Not too much earlier before I took this shot, the weather radar showed another lovely green blob right over us. … What we *really* had was a whole lotta blue in the big ol’ sky! I think it comes down to this: The weather gurus are just as hopeful as we are. (Otherwise, there are seriously some techy gremlins in their weather equipment.)

In very good and wonderful news, Connie Clementson, manager of Tres Rios Field Office, released a letter Monday saying that after “thoughtful consideration of the analysis and comments received” (thank you!), she has chosen the preferred alternative – Alternative A – presented by our herd manager, Mike Jensen, for our Spring Creek Basin Herd Management Area Plan revision. 🙂 🙂 🙂

Now there’s a 30-day appeal period, then the decision record becomes final, and all that we’ve worked for these last many years is the official management plan in Spring Creek Basin. Documentation, bait trapping, PZP-based fertility control, AML increase … it’s all there.

I can’t begin to articulate my gratitude and overall feelings of relief. Thank you to all those who made this happen. You know who you are, and you know you are appreciated!

The world is kinda one big crazy-town right now, but all I have to do is drive into the basin, spot some horses, walk out, plop myself on the ground (dry as it is … watching for cacti and slitheries, of course) … and all that crazy melts away.

Nature and wild horses truly are the best medicine for what ails us (somebody said that once upon a time, I’m sure of it!), and I am so blessed and thankful to have huge dollops of both in my life.





More little things

29 05 2020

As if we needed more proof that our mustangs are divine and under the shine of a higher power!

As May comes to a close, I want to remind readers that the comment period for our Spring Creek Basin Herd Management Area Plan EA is coming to a close (Saturday, May 30). If you’ve already submitted your comment letter, thank you! If you’ve procrastinated, now is the time to type out a letter of positive support regarding Tres Rios Field Office’s HMAP EA. It will guide the management of our mustangs for the next couple of decades and ensure that they are managed and protected to our highest standards.

Here’s the link to BLM’s eplanning site, on which you can find the draft HMAP EA and the button that will allow you to comment through that site:

Or you can send an email to our excellent herd manager (and author of the HMAP EA), Mike Jensen, at m50jense at blm dot gov.

Please note that you support Alternative A – Proposed Action. If you have personal knowledge of our herd and mustangs – whether by visits or even through this blog – please let them know.

Read more at my initial post about the draft HMAP EA at https://springcreekbasinmustangs.com/2020/05/02/little-things/.

And thank you. 🙂 We so appreciate your support.





Little things … that become ginormous

2 05 2020

041320Ravenbird1

Do you see the little bird, taking flight in front of Raven?

Do you see the head and ears of the horse below and beyond Raven?

Do you see Raven, divine wild girl, in all that delicious evening light?

Do you feel the magic?

********************

My friends, my fellow lovers of Spring Creek Basin’s marvelous mustangs, the draft HMAP EA is out for comments. (That’s herd management area plan environmental assessment in non-acronym-speak, and it lays out the overall plan for the next umpteen years of management of our Spring Creek Basin mustangs.)

It’s kinda huge.

OK, in the grand scheme of all that’s going on in the country, in the world, right now, it’s a blip. And I do not make light of those who are suffering terribly now, in so many ways.

This EA represents countless hours and days and weeks and months – the last couple of years – of work by our uber-respected BLM herd manager, Mike Jensen, at Tres Rios Field Office in Dolores, Colorado. It represents field work (vegetation monitoring, land-health assessments), and it represents computer time. It represents a career spent doing good things, positive things, for the ranges he has managed during his work with BLM. It represents gathering facts, lining up the science, listening to partners, speaking to a wide variety of people … and honoring the good management we’ve achieved, together, for Spring Creek Basin’s mustangs, these descendants of horses from cavalry, Native American, settler stock and beyond, and ensuring that what we have worked so hard to achieve will be set down in the herd management area plan going forward for Spring Creek Basin Herd Management Area.

I cannot overstate the enormity of this document and what it represents. I cannot overstate the positivity of what this document represents.

It means our Spring Creek Basin mustangs will be as well managed as possible, protected, the range on which they depend will be protected, and we will continue to do all in our power to ensure that they live long, healthy lives, as wild and free as they were born to be.

There’s a lot of crazy in the world, yes. BUT. Spring Creek Basin, as so many have discovered, is a place of peace and beauty and magic and partnership, and our goals, set so long ago, are coming to fruition.

Among other things, Alternative A (preferred, of course) sets the appropriate management level (AML) at 50 to 80 adult horses, an increase from the current 35 to 65 adult horses. As Mike said, the science (the vegetation monitoring, the land-health assessments, the PZP fertility-control program) supports it. This is absolutely what I have hoped and prayed and worked so hard to have happen … for what seems like a million years.

Don’t worry – we will continue to introduce mares periodically to ensure the viability of our small herd’s genetic health. And don’t forget: Spring Creek Basin is almost 22,000 acres of high-desert, low-rainfall, kinda-scrubby, perfect-for-wild-horses geography. Translation: It’s small in terms of ranges, and we worry about water even in good years. Also keep in mind that BLM closed the allotment to livestock grazing a few years ago, and with PZP treatments keeping our foal crops low each year, we CAN increase the AML a bit and not fear that it will reduce the current quality of the range. That’s a win-win.

BLM also will continue the current, natural, 50-50 stallions-to-mares ratio. Also good.

Here’s the link to the eplanning site (the above link will take you directly to the PDF): go.usa.gov/xpJKn

Once there, click on the “Documents” link on the left side of the page. Then click the “Draft EA and Appendices” link. (Below that is the link to the scoping letter that we commented on a couple of months ago.) Then click the PDF icon to the left of “Document Name: Draft DOI-BLM-CO-S010-2020-0009-EA.pdf.” A new tab will open in your browser with the PDF document of the draft HMAP EA.

There are only two “Proposed Actions and Alternatives”: “Alternative A – Preferred Action” and “Alternative B – No Action.” We, of course, prefer the preferred Alternative A. 🙂

Please comment as you have before (the deadline is May 30), for the mustangs. For all the work and blood and sweat and tears (I was crying (with joy) so hard when I called my mom yesterday morning, she couldn’t understand me and thought something was wrong!) freely given from all of us who have worked so hard to get to this point. For Mr. Mike Jensen, BLM herd manager and range specialist extraordinaire, who created this management plan that includes all our hopes for our mustangs’ futures.

This is a shining ray of light in the way things can be done for our mustangs. We are so grateful.

Thank you, thank you and thank you.

041920Voncolt2

For this little guy and all those that were born to be wild and free in Spring Creek Basin – and all those yet to come into their wild world.





He’s bold, he’s red

31 01 2020

122119Hayden1

He’s Master Hayden.

**********

FYI: Local (Cortez) newspaper The Journal published an article about the HMAP-revision scoping period in its Thursday online edition.

And in case you missed it, here’s the link to my previous blog post about “Revising our HMAP.”





Revising our HMAP

22 01 2020

012020Skywalker1

Same basic, iconic view … different day, different grey!

**********

As most regular readers of this humble blog know, we have worked closely and for many years with BLM managers of Spring Creek Basin Herd Management Area. Our partnership is one to be envied; we have great respect for our BLM folks – especially herd manager Mike Jensen – and the health of our mustangs and the range they call home is directly because of that partnership.

We have accomplished almost everything on our big-goal to-do list for Spring Creek Basin’s mustangs, including the commitment to using bait-trapping if/when we need to remove horses in the future and our successful fertility-control program using native PZP. How successful is it? We’re celebrating our NINTH year of NO roundups and removals in Spring Creek Basin. I’d say that qualifies. 🙂

All of the things we have done and are doing – and the fact that our current one is 26 years old  – means we’ve come to another big goal: updating Spring Creek Basin’s herd management area plan. Mike Jensen has been working on that for a while now, and a LOT goes into it.

So to *start* the process (see above where I note that a LOT goes into it, including time in the field doing vegetation monitoring over the last few years, archaeological-site assessments, ongoing data collection about our PZP program, etc.), we come to the scoping process for updating the herd management area plan, otherwise known as the HMAP.

Here, you will find that scoping letter on BLM’s eplanning website.

At the left side of the page, click the “Documents” link. On the next page, under “Document Name,” click the link for “Spring Creek Basin HMA Interested Parties Letter.”

At the first link, read the information (the other two links will take you directly to the page to access the document link and the comment link, and the letter itself):

“The BLM is preparing an Environmental Assessment (EA) pursuant to the National Environmental Policy Act of 1969, as amended (NEPA) to analyze the proposed action and alternatives to that action.

“What: Name/Type of Proposed Project: Spring Creek Basin Herd Management Area Plan (HMAP) Revision.

“Where: General and Legal: This Spring Creek Basin Herd Management Area (HMA) is located within the Spring Creek Basin portion of Disappointment Valley in Southwest Colorado. The HMA is approximately 21,932 acres is size and lies within both Dolores and San Miguel Counties.

“Disturbance: Estimated Disturbance (acres/area) Description: The HMAP Revision will include the proposal for constructing two water catchment structures which will result in approximately 1.0 acres of total of ground disturbance.

“When: Expected Implementation and Duration: The Herd Management Area Plan would be implemented immediately following the issuance of the Final Decision.”

**********

On to the letter.

What it’s TELLING you is that Tres Rios Field Office (where Mike is employed as a rangeland management specialist and Spring Creek Basin’s herd manager) is “seeking input on a proposal to revise the 1994 Spring Creek Basin Herd Management Area Plan (I just realized, on typing that, that they swapped a couple of words) for the Spring Creek Basin Wild Horse Herd Management Area in Dolores and San Miguel Counties, Colorado. …”

In addition to advising interested parties about potential disturbance of about an acre of land total for the construction of two (more) water-catchment structures, this is the stated “purpose and need” of the HMAP revision:

“The BLM is proposing to revise the 1994 Spring Creek Basin HMAP. Herd Area Management Plans (again, word swap!) identify specific management actions, goals, objectives and monitoring for managing wild horses and /or burro herds and their habitat. Therefore, the proposed HMAP revision will identify goals, objectives and monitoring to address 1) existing appropriate management level (AML) of wild horses; 2) rangeland health conditions; 3) population control measures; 4) removal criteria and gather techniques; 5) genetics; 6) population dynamics; 7) range improvements; and 8) sustaining healthy populations of wild horses.”

What it’s ASKING is for the public to offer comments about those issues along the lines of answering these basic questions:

Do you agree with those topics/issues BLM has identified?

Are there additional topics/issues you might like to see identified/addressed in the revised HMAP?

The comment deadline is Feb. 19, and as you’ll see in the letter, there are a variety of ways of delivering those comments: There’s a “Comment on Document” button on one of the pages linked above; send an email to Mike (address in the letter); send your comments via USPS mail to the office (address in the letter).

**********

Now some suggestions.

First of all, do we want Spring Creek Basin’s HMAP revised and updated? Yes, please! 🙂

Do we want a couple of new water-catchment structures? Yes, please!

So let’s look at each of the topics from the letter.

  • Existing AML. We would like to raise this slightly, and based on vegetation monitoring conducted the last few years, as well as the use of PZP fertility control and the slow, measured growth of the population during the last nine years since the 2011 roundup and removal, we believe this is reasonable. Also a contributing factor to potentially raising the AML: No livestock grazing allotment exists within Spring Creek Basin; the remaining permit was relinquished and the allotment closed in accordance with BLM TRFO’s 2015 resource management plan. The current AML is 35 to 65 adult horses.
  • Rangeland health conditions. Having participated in vegetation monitoring in Spring Creek Basin the last few years, including the Rangeland Health Assessment, it’s important to note that by and large, the condition of the range in Spring Creek Basin has improved (even during extreme drought situations) since previous monitoring was completed and is continuing to improve. This can be attributed to management of the herd’s population growth with the use of fertility-control vaccine PZP.
  • Population control measures. Native PZP continues to be extremely effective in managing the population growth of Spring Creek Basin’s mustang herd, and we urge its continued use.
  • Removal criteria and gather techniques. As one of the authors of the bait-trapping proposal that was accepted and signed as an EA by BLM in 2018, I urge that bait trapping continue to be the gather technique of choice in Spring Creek Basin. Many discussions have been held about the viability and potential success of this method in the geography of Spring Creek Basin, with our well-documented mustangs. Removal criteria should continue to reflect current documented age and genetics dynamics, as explored elsewhere in this document.
  • Genetics. Because Spring Creek Basin Herd Management Area is small (almost 22,000 acres) and its herd is correspondingly small, genetics is an extremely important topic to consider with regard to the sustainability of this herd and its health. Introducing mares periodically, as was done in 2008 and in 2001 (and stallions, less successfully, in the 1990s), should continue at intervals that reflect current management practices in Spring Creek Basin, and the ages and offspring of previously introduced mares – all of which are known from the 2008 introduction because of documentation since 2007.
  • Population dynamics. To have a healthy herd, we must have a healthy mix of stallions and mares, as well as age groups within the herd. Currently, we have a fair number of horses older than 10, as well as horses filling every age year from 2007 and younger. We favor a healthy, natural relationship dynamic of a roughly evenly mixed stallions-to-mares ratio. Keeping this ratio natural with the use of native PZP is an attained goal.
  • Range improvements. During the last 20-plus years, advocates have partnered with BLM to improve Spring Creek Basin’s range with various projects including fencing, weed identification and location, water-enhancement projects, identification of ponds to be dug out (because of silt and sedimentation buildup), and vegetation monitoring, all of which enhance our knowledge of the range and how the horses use it. We are proud to partner with Tres Rios Field Office managers to keep our horses and range healthy and urge the continuation of the same partnership, which has become a model in the BLM-citizen-advocacy community.
  • Sustaining healthy populations of wild horses. Keeping our horses healthy depends on keeping our range healthy, and we remain committed to helping BLM ensure the continuation of both with volunteer projects including PZP darting, documentation, vegetation monitoring and help with all range projects.

Regarding the disturbance expected for approximately 1 acre for the proposed construction of two water guzzlers/catchment structures: Herd manager Mike Jensen explored two potential sites with an archaeologist from Tres Rios Field Office and found no cultural resources at either site, leading to acknowledgement of both sites as good for guzzler placements. In addition to providing two additional sources of clean water for the mustangs, siting the guzzlers in those locations will help with the dispersal of the horses to currently under-used grazing areas within Spring Creek Basin.

**********

011020Hollsband2

If you made it this far, you deserve another pic of our beauties. 🙂

Thank you for reading this far!

To reiterate a very important fact: We work very closely with Mike Jensen and our Tres Rios BLM folks for the good management of our Spring Creek Basin mustangs, and have for a very long time.

Much of that work is the fun stuff: In-the-field, boots-on-the-dry/dusty/muddy/snowy-ground, mustangs-near-and-far, under-blue-sky-in-the-great-wide-open awesomeness. Some of that work involves paper (and computer) work.

We thank you for following along with our Spring Creek Basin mustangs and for your support during these many years. If you’d take a few moments to send comments to Mike about this scoping letter, we’d sure appreciate it! If you’ve visited Spring Creek Basin and the mustangs, say so. If you know the horses and our advocacy work through this blog or elsewhere, say so. Say that these mustangs are important to you, and please say how much you appreciate BLM’s partnership with advocates on behalf of Spring Creek Basin’s mustangs.

Thank you all in advance for helping us achieve our goals for our beloved mustangs. We know how much you love them, too!

011920Madison1