Copper in a white world

15 12 2022

Hollywood is usually one of the specific horses I look for in Spring Creek Basin to help show off the white goodness when we get snow because his color is so RICH and divine. The clouds had come over by the time I found him and his family, but he still stands out like a particularly bright spot in an otherwise mostly-monochrome landscape. He may not have the “beard” some of the horses grow in winter, but you can see how wonderfully thick is his velvet coat!





Queen of her world

14 12 2022

Temple was soaking in the rays during a little nap while her family grazed around her.

The temp was cold (around freezing?). The snow was crisp. The day was gorgeous! Just like the mustangs. 🙂





Wish granted!

13 12 2022

Mother Nature blanketed Spring Creek Basin with at least a couple of inches of snow! The amount varies a bit, but I’d guess there’s an average of at least 2 inches of the golden white stuff covering the range. It came in on a fairly warm wind, and the snow was nice and wet. Now, our temps are going to drop significantly, with highs in the 30s – much more seasonal for Colorado in December than the 40s and 50s we’d been enjoying lately.

Mostly, the horses seemed to be sheltering in out-of-the-way places, and I didn’t see many bands, but Cassidy Rain and her family were happy to visit briefly (well, maybe *I* was the one happy to visit?). 🙂

Now, let me take you on a little tour around Spring Creek Basin, seen under a pristine cover of fresh snow:

From near the original water catchment looking northwest over the rimrocks above Spring Creek canyon over northern/northwestern Disappointment Valley. Utah’s La Sal Mountains are usually visible along the horizon in the distance … but it was still snowing over them while the clouds over us were breaking and giving us that brilliant Colorado sunshine.

Our newest water catchment got a good dose of snow to start melting and filling the tanks!

From the north(ish) part of the basin, looking southeast toward McKenna Peak and Temple Butte. Look at all that pillowy white frozen goodness!

Approaching the basin’s east pocket: Juniper and her family – and the rest of us – got our snowy wish. 🙂

As I was heading out of the basin, just as the sun was sinking into a cloud bank above the valley’s southern ridges, I stopped on rollercoaster ridge to photograph a wild little snowburst over western Disappointment Valley beyond Spring Creek Basin – from a single crazy cloud! And yes, in the foreground is a pond, still – still! – nearly full to the brim.

Despite the coming frigid temps, I think we’re all pretty happy about the snowfall. 🙂





Masterpiece

5 12 2022

Tenaz on an evening that looked like a masterpiece of color and shadow and light. (It was.)





Snow-white model

1 12 2022

For some reason, a pinto mustang pony always stands out beautifully in the snow-covered landscape. Miss Chipeta wasn’t really feeling her modeling session, but in keeping an eye on me, lounging in the snow, a beautiful model was she, indeed!





Grey & white

29 11 2022

We got a surprise Sunday morning in the form of about half an inch of snow! The forecast for at least the last week focused on snow Monday night into Tuesday afternoon, but this Sunday-night/early-Tuesday-morning snow was a pleasant little early gift!

It melted quickly, as usual, but the far slopes and ridges of McKenna Peak and Temple Butte show some lingering whiteness, which always looks great behind Miss Temple. (And yes, she’s wearing some mustang bling in her forelock in the form of a little burr, which are nature’s fall jewelry hereabouts!)





Water catchment 2 – phase 2, day 5

26 11 2022

As previously announced, our newest water-catchment project is finished! Now we just need snow (which, according to the forecast, is coming Monday night/Tuesday). And to continue the theme of gratitude this Thanksgiving weekend, we couldn’t be more grateful!

Last Thursday (exactly a week before Thanksgiving), this was about all that remained to finish the roof: Garth Nelson and Daniel Chavez had a few more purlins to weld to the I-beams, and Mike Jensen and I had a few more propanel roof sheets to screw down to the purlins.

One reason I love to highlight these work projects our BLM guys do in Spring Creek Basin is, of course, to highlight the work they do for our mustangs. Another, related, big reason, is to highlight our partnership in doing so. … And because these three guys – Mike, Garth and Daniel – work as well or better together than any three people I know. It’s pretty amazing to be around their creativity and can-do attitudes. So my photographer’s heart was really stoked when a particular purlin required Garth (right) and Daniel to literally put their heads together to get it welded to the I-beam.

Again, you really can’t beat our “office” scenery.

The unmasking. 🙂

All three guys working together. 🙂 After we finished the roof, it was time to put the gutter up along the front of the structure!

When the gutter was in place all along the front of the structure and secured, we switched up our pairings: Mike and Garth got to work on measuring and cutting and gluing the pipes from holes drilled in the bottom of the gutter to each of the tanks, and Daniel and I worked to put more spacers and long screws through the gutter to the front beam (Daniel handled the measuring and drilling; I did the handing of spacers and screws … and photo documentation :)). I didn’t take a pic of those “spacers,” but they were about 6-inch long pieces of small-diameter metal tubing, through which the screws ran, the function of which was to keep the sides of the gutter from collapsing when the screws were run through the gutter.

Gotta make sure all the pieces fit together tightly!

I didn’t get Mike’s face in this one with Garth and Daniel because he was holding the part of the fitting inside the gutter while Garth tightens it at the underside of the gutter, but I still like this shot of all the guys working together. Mike and Garth were working from the northwest to the southeast side of the gutter and tanks, and after we got the gutter up with a minimum number of spacers and screws, Daniel and I were working back from southeast to northwest – this is where we met “in the middle.”

Measuring the pipes before gluing.

Great work in the foreground. Great scenery in the background. 🙂

Moving toward conclusion.

The gutter comes in pieces that overlap, so Mike and Garth caulked each seam as well as under the fittings for the pipes inside the gutter.

And they also used a spray-on sealant along the outer seams of the gutter pieces and to coat the outer parts of the pipes. That will help protect the PVC pipe as well as give it a little more help in absorbing the sun’s warming rays during the winter.

The green things seen in front of each tank are two pieces: One is a ring that goes around the top, exposed part of the culverts that protect the below-ground valves for each tank, and the other (see it leaning against the farthest tank?) is the lid to keep critters (like snakes) out of the holes.

One final piece to show you readers (in two pix):

Garth welded his name onto the top of one of the I-beams, and …

… Daniel welded “2022,” “TJ,” “MLJ” and “D. Chavez” into the southeast-end beam of the structure. 🙂 Last year, he welded “BLM 2021” into one of the end-facing pipes.

When we finished the new water catchment, before we left Spring Creek Basin, we went over to last year’s new catchment and welded that little walk-through gate to the pipe (see the post about the previous day of work). Until then, it was secured with wires and didn’t swing. Now, access is as easy as unchaining the gate and swinging it open. Panels like those pictured eventually will enclose the newest structure to keep the horses from rubbing on the tanks or messing with the culvert caps.

Best of all, this pic of Garth, Mike and Daniel shows some hard-working BLM guys who put a lot of thought and effort into ensuring that our mustangs have good water (quantity and quality) in Spring Creek Basin! With the addition of these two new water catchments in the last two years, our ability to store water that is clean (not salty or silty) and not subject to evaporation increases from 24,000 gallons (two 12,000-gallon tanks for each of the other two catchments) to 50,500 gallons!

This Thanksgiving weekend, especially, we are SO thankful. 🙂 Thanks to our amazing BLM partners for all they do for our mustangs!





Pretty under the peaks

25 11 2022

Maia and Alegre are a pretty pair under the basin’s iconic pair of McKenna Peak and Temple Butte.





Mr. Cool

22 11 2022

Hollywood: Handsome in every light and enhancing every background. 🙂





Water catchment 2 – phase 2, day 4

21 11 2022

It’s finished!

In terms of pix and storytelling, that’s jumping the gun a bit, but I am so excited and proud of this project (as I am of all the projects we do in Spring Creek Basin for our mustangs), that it seemed appropriate to start with the best part of the news.

What follows – in this post and one more future post – are pix of the last two days of work that take this water-catchment project from nearly done to ready to catch snow and rain!

Early last week, Garth Nelson and Daniel Chavez sneaked out to the basin with the purlins needed to weld onto the I-beams and got started welding them into place. Wednesday – the day featured in these images – Mike Jensen and I joined them to start putting the propanel (metal) roof sheets into place and screwing them into place atop the purlins. Above, Mike puts the first screws in place to hold the first sheet down!

Garth and Mike align the front edges of the roof sheets – which will just overhang the gutter – and screw them into place while Daniel watches.

As the first roof sheets were laid down, Daniel and Garth returned to their partnership of setting the purlins in place and welding them to the I-beams.

Mike and I got the roof sheets up and screwed down pretty quickly and then would wait while Garth and Daniel methodically welded each purlin in place.

Mike had the yellow drill, and I had the red. … I was pretty fond of that little tool over the two days. 🙂 Note how the purlins face in different directions. Garth and Daniel did that on purpose. Because the purlins had some “bend” to them, they reasoned that alternating the directions of the purlins would increase stability. Mike and I, walking about and drilling on that roof, can attest to the stability!

The purlins met atop the I-beams, to which Daniel and Garth welded them.

As Daniel welded, Garth held his end of the purlin in place, and vice versa, as you can see a couple of pix above.

As always, the guys used their portable welder on the back of the truck. The propanel roof sheets were on the flatbed trailer, and Mike and I would lift a few of those to the roof at a time, then climb back up on the roof (using their second truck as our “ladder”) and screw them down.

Closing in on the end of the roof!

I was happy to grab photos while Mike and I waited for Garth and Daniel to weld their purlins.

And we found ways to fill our time and stay busy. That little walk-through gate will eventually allow us to access the “interior” of the water catchment – under the roof – to do any maintenance or attend to valves at the tanks, etc. The panel “fencing” will go up later. How do you attach hinges to round steel pipe?

The welders weld the hinges to the pipe, of course!

And so the ends wouldn’t stick out to catch an unwary mustang, Mike sawed them off. 🙂 Always thinking about the horses, these guys!

This view is from up the hill, “behind” the water catchment, looking down the hill. You can juuuuust see the trough at far right behind Daniel.

And about here is where Wednesday’s work ended.

Our weather has been sunny and cold (teens) in the early mornings, followed by highs in the 40s or so – warm enough when you’re working! And among the benefits, remember: No gnats! 😉

As Paul Harvey used to say – at the end of the story – “the rest of the story” will be coming soon!