Pretty under the peaks

25 11 2022

Maia and Alegre are a pretty pair under the basin’s iconic pair of McKenna Peak and Temple Butte.





Mr. Cool

22 11 2022

Hollywood: Handsome in every light and enhancing every background. 🙂





Water catchment 2 – phase 2, day 4

21 11 2022

It’s finished!

In terms of pix and storytelling, that’s jumping the gun a bit, but I am so excited and proud of this project (as I am of all the projects we do in Spring Creek Basin for our mustangs), that it seemed appropriate to start with the best part of the news.

What follows – in this post and one more future post – are pix of the last two days of work that take this water-catchment project from nearly done to ready to catch snow and rain!

Early last week, Garth Nelson and Daniel Chavez sneaked out to the basin with the purlins needed to weld onto the I-beams and got started welding them into place. Wednesday – the day featured in these images – Mike Jensen and I joined them to start putting the propanel (metal) roof sheets into place and screwing them into place atop the purlins. Above, Mike puts the first screws in place to hold the first sheet down!

Garth and Mike align the front edges of the roof sheets – which will just overhang the gutter – and screw them into place while Daniel watches.

As the first roof sheets were laid down, Daniel and Garth returned to their partnership of setting the purlins in place and welding them to the I-beams.

Mike and I got the roof sheets up and screwed down pretty quickly and then would wait while Garth and Daniel methodically welded each purlin in place.

Mike had the yellow drill, and I had the red. … I was pretty fond of that little tool over the two days. 🙂 Note how the purlins face in different directions. Garth and Daniel did that on purpose. Because the purlins had some “bend” to them, they reasoned that alternating the directions of the purlins would increase stability. Mike and I, walking about and drilling on that roof, can attest to the stability!

The purlins met atop the I-beams, to which Daniel and Garth welded them.

As Daniel welded, Garth held his end of the purlin in place, and vice versa, as you can see a couple of pix above.

As always, the guys used their portable welder on the back of the truck. The propanel roof sheets were on the flatbed trailer, and Mike and I would lift a few of those to the roof at a time, then climb back up on the roof (using their second truck as our “ladder”) and screw them down.

Closing in on the end of the roof!

I was happy to grab photos while Mike and I waited for Garth and Daniel to weld their purlins.

And we found ways to fill our time and stay busy. That little walk-through gate will eventually allow us to access the “interior” of the water catchment – under the roof – to do any maintenance or attend to valves at the tanks, etc. The panel “fencing” will go up later. How do you attach hinges to round steel pipe?

The welders weld the hinges to the pipe, of course!

And so the ends wouldn’t stick out to catch an unwary mustang, Mike sawed them off. 🙂 Always thinking about the horses, these guys!

This view is from up the hill, “behind” the water catchment, looking down the hill. You can juuuuust see the trough at far right behind Daniel.

And about here is where Wednesday’s work ended.

Our weather has been sunny and cold (teens) in the early mornings, followed by highs in the 40s or so – warm enough when you’re working! And among the benefits, remember: No gnats! 😉

As Paul Harvey used to say – at the end of the story – “the rest of the story” will be coming soon!





Water catchment 2 – phase 2, day 3

16 11 2022

We may not have snow, but the temps are telling us that winter is nigh! Garth Nelson and Daniel Chavez were in the basin this week, working in the cold wind to get the first batch of purlins in place and welded to the I-beams. They said they saw more vehicles in the basin the last two days than in the last year. … Have I mentioned that third rifle season here is like Grand Central Station? … Fortunately, not for much longer; it’s over half an hour after sunset Friday.

Every little bit brings the project closer to completion!





Water catchment – phase 2, day 2 (more)

14 11 2022

As promised a few days ago, here are some more pix of the work on the newest water catchment in Spring Creek Basin. 🙂

You won’t ever catch our BLM guys sitting down on the job! As I mentioned in the last post about the project, the guys started by setting up the laser level to mark the heights of the steel pipes that will hold the I-beams, which will support the purlins, which will be topped by the roof, which will catch the rain and snow to fill the tanks to water the mustangs! So here, Garth Nelson is setting the laser in a place where it will be high enough to shoot over the tops of the tanks so the pipes can all be marked. Not sitting down so much as getting the eyeball view!

While Garth set up the laser level, Daniel Chavez held the little doohickey that caught the laser at the right height at all the pipes and marked the appropriate levels.

Measure many times and many ways before the final cut, goes the saying? Garth and Mike Jensen also ran string lines to ensure the levels.

Most of the pipes required a fair bit to be cut off, but this one needed just a little sliver. … It also was the pipe that started to alert the guys that something was amiss with the blade(s) on their nifty little saw – and this pic of Daniel using it gives a little better glimpse of that tool.

For those of you interested in such things, here’s another angle of one of the guys’ favorite tools. The “blade” is a band that goes around those black wheels on the underside of the tool. Usually, it saws through heavy “stem pipe” almost like a hot knife through butter (a bit slower, but steel is, after all, steel!), but the first couple-few blades they tried – brand new out of the package – were just dulling the teeth on the blades within minutes. NOT working. That’s what led to the double-tool whammy of using the grinder tool as well as this tool – and then finding the blade that worked, which worked for all the rest of the pipes.

Using the tractor to carry the heavy I-beams to set atop the pipes.

While Daniel got started welding the first I-beam to the pipes in the middle of the catchment structure, Garth finished cutting the pipes to height/length.

The welding process fascinates me …!

The A-team!

Sparks flying – another good reason to wait till cooler weather for the completion of the project. 🙂

Garth holds the I-beam steady and level while Daniel makes the first weld to hold it in place.

Garth finished the welding on the last beam.

Working in Spring Creek Basin does have the perks of fabulous scenery. 🙂

Next up should be welding the purlins atop the I-beams!





Water catchment – phase 2, day 2

12 11 2022

Work resumed this week on the water catchment in Spring Creek Basin’s northwest valley. We were ahead of the snow that came Wednesday, and although we had an absolutely beautiful day, it was windy. We joked that Wyomingites would consider it merely *breezy*. We did gratefully note that there were no gnats. 😉 By Wednesday (and even Tuesday afternoon as we left the basin), I thought maybe we shouldn’t have joked about the wind, as it got *really* strong. … But … no gnats. There’s always a silver lining!

Once we got out to the site, the guys used the laser level to start measuring the heights of the steel pipes to ensure they would level length-wise (across the hill) and sloping width-wise (down the hill). We all converged to mark them by laser level, string and tape-measure methods at the appropriate heights, then Daniel Chavez (front right) and Garth Nelson (on the step stool) started cutting while Mike Jensen (left) and I stood by to help. … But shortly, they realized there was a problem with the nifty cutting tool that Garth is using in the pic above: The blade wasn’t really getting the job done. And I’ll be the first to tell you that THAT tool is one of their favorite tools for the *usual* ease with which it cuts through that heavy steel pipe.

One of the greatest things about Spring Creek Basin is, of course, its distance off the beaten path. But that also makes it a far distance from things such as, say, shops that sell tools – including new/sharp saw blades that don’t go dull within moments!

But our guys are as resilient as they are creative and engineering-minded and hard working! One of the other tools they had was a grinder-type of thing. While it wasn’t quite the tool for the job, they did have a cutting disc that could slice into the pipes, to be followed by the bigger saw. So they did that for several pipes … changing blades on the bigger saw a few times. Then, finally, the last blade was the ticket. Garth still cut into each pipe at the appropriate mark, and Daniel finished them off.

Here, they worked together: Daniel had gotten most of the way through one of the pipes, and Garth returned with the grinder tool to get through the last little bit … and then …

Look out below!

When all the pipes were cut to the right length/height, it was time to bring in the little orange muscle – the tractor! Last year, you’ll remember that the guys welded the purlins to the pipes, then screwed down the roof sheets onto those. This time, they brought out five I-beams. Those are the step between the pipes and the purlins the guys added to this year’s project. The I-beams will give them a wider and steadier base on which to set/weld the purlins in the near future. But those suckers are much heavier than the purlins, so some mechanized muscle was needed.

The first beam went to the middle, then we worked outward from either end.

With the beam supported by the tractor, the guys were able to get the beam(s) in place atop the pipes. Then it was just a matter of shoving (!) the beams forward to the mark(s) Mike and I made so each had an overhang of a foot from the front pipes. Along the front of the tanks, just below the roof – soon – we’ll run the gutter.

Once the beams were in place atop the pipes, and the level and slope checked, Daniel welded them in place.

Daniel did most of the welding, but he had to leave early, so Garth donned the welding gear and finished the job. (How great is it to have not one handy welder but two!)

The day’s work started with some camera issues (in addition to those tool issues mentioned above), so I used my phone … then (fortunately) checked my camera again and noticed and corrected a couple of settings. The above are all from my phone (which did a respectable job!). I’ll process some of those camera pix to post soon – just because I love to highlight the good work our BLM guys do in support of our mustangs!

In the meantime …

From last week’s work ^ – note the pipes …

… to this week’s progress ^ – note the beams atop the pipes!

It’s all coming together. 🙂





Water catchment 2 – phase 2, day 1

6 11 2022

Well, we outlasted the summer heat, the gnats, the dust, the wind, the dust, the gnats, the heat, the dust (you get the picture), and it’s time to finish our second new water-catchment project for our mustangs of Spring Creek Basin!

Last week, after waiting out the drying roads and before the next round of moisture (soaking rain and big, fat flakes of snow that didn’t stick but added to the moisture), Mike Jensen, Garth Nelson and Daniel Chavez – our BLM range heroes! – came out with tools and supplies, and we got started on phase 2 to get the catchment finalized to take advantage of hoped-for winter snow.

If you need a quick refresher about our work to install the tanks and piping and trough, click on June 2022 over on the right under Archives, then scroll down to find the posts about that work.

It all starts with the first post (pipe) hole! Well, it really all starts with running a string (see the pink line across the tanks?) to dig the holes so the line of steel pipes – to support the roof structure – will be in a straight line. Garth (left) and Daniel are on the gas-powered augur (what a difference that makes to digging holes! especially as many as this project requires), and Mike supervises. He would later do the lion’s share of work with the post-hole digger (far left) and tamp bar when the augur wasn’t quite enough to break through the calcium layer of soil.

Moving right along. You can see by their bodies that Garth and Daniel are putting their weight and strength over the augur to dig deep into the soil.

This was the last hole across the front line of the tanks.

Have you noticed the black straps over the tops of the tanks? As you might remember, we had another good monsoon year (heck, we HAD monsoons again this year after *not* for a few years). After the tanks were in the ground (in June) – piped together at the bottom, the dirt covered back over – at least one of those big rains poured off the hill behind and above the tanks and ran across the not-so-settled dirt around them … and sort of UPROOTED at least two of the tanks – and broke at least one pipe connection! The BLM guys had to come back and fix that little issue (no pix of that because the designated photographer/documenter (that’s me) was on vacation in Wyoming at the time). The straps over the tanks – snugged to T-posts driven into the ground – were to hold them in place in case of another gully washer – which seems to have worked.

Mike checks the level of the pipe while Daniel finagles the concrete to straighten the tilt.

Right on the money! These pipes will be holding an immense weight to support the propanel roof sheets, so the guys filled all the holes with concrete to ensure the longevity of the pipes in our erosion-prone soil.

While Mike and Daniel were mixing and pouring the concrete, Garth was cutting the pipes into sections to place in the holes that the guys had dug with the augur. I went back and forth, lending a hand wherever needed and taking pix of the work (because all good work should be documented!).

The guys work together to shovel the concrete into one of the holes to stabilize one of the pipes.

Getting close to end end of hole-auguring on the back side (uphill side) of the tanks. Of note: The white on the far ridges, including McKenna Peak and Temple Butte, IS, in fact, snow. That seems at odds with the guys wearing T-shirts, but it was warmish until the wind picked up. And did I note that it wasn’t HOT, and there were no gnats and no dust?

Here, you can see the pipes that we’ve already placed – and concreted in place – that will serve as supports for the roof.

And then, as we were getting close to placing the last pipes, THIS happened: A couple of bands came down the hill from the northwest bowls (little “swales” in the northwestern part of Spring Creek Basin, above Spring Creek canyon) to drink at the pond in this area that I call the northwest valley. Why are we building a water catchment in an area that has a pond, you ask? Because, other than this year (of course), that pond only rarely has water in it, which meant that this area – usually dry – is a really GOOD location for a water catchment. And it has proved to be a good location – this year – for showing us that the horses will use this area – and graze it – when there’s water there to drink!

The guys used a couple of methods to ensure straightness of the posts (not just the straightness of each individual pipe but all of them related to all the others in lines up and across), including the string line (pink, tied to the short bit of rebar between Mike and Garth); measuring distance with a tape measure between the posts pictured, as well as those to the left, out of sight; and Daniel, shown here employing the eyeball method – sighting along the three pipes.

Mike and Garth level the pipe while the horses decide there’s not much to worry about and go on to the pond.

Peace on both sides, horse and human.

More of the same. I so loved that the horses, after their initial shock at seeing us at their watering hole, pretty quickly decided that we weren’t doing anything upsetting at all.

And the last pipe is in place!

It’s a good-size pond, and when it holds water, it holds a fair quantity!

Shortly after this, we were done with all the pipe placement and started cleaning up tools and supplies. The horses drank and wandered off to graze in the little valley. Even when the guys rumbled out in their trucks, the horses weren’t bothered. I stayed to take some pix. Before I left, two trucks with sightseers (importantly, not hunters (the end of today marks the end of the second rifle season … two more to go …)) drove up into the northwest valley. The horses had drifted and were grazing right along the road, but the visitors moved super slowly and respectfully, and the horses gave them a marvelous view for pictures right through their passenger-side windows!

We’ll continue work on the roof structure over the tanks as weather allows. Another moisture-bearing system is headed our way by Tuesday night. 🙂





Happy birthday, Mom!

28 10 2022

Happy birthday to my mom, like Madison, family guardian, making sure we all get what we need and where we need(ed) to go. And handling it all with grace and beauty and patience (!). 🙂

Happy birthday, Mom! I love you!





Recognizable

26 10 2022

Hollywood, still lookin’ good at an estimated 20 years old. 🙂





White gold

25 10 2022

Did I mention that Spring Creek Basin and Disappointment Valley got rain?

And then we got snow. 🙂 And before Halloween!

This was yesterday morning in Disappointment Valley, just beyond the rimrocks and southwest of Spring Creek Basin. No ponies-in-snow pix; too muddy, and that snow was melting fast! For fare somewhat different than you usually expect to see on this blog, please enjoy this mix of pix of golden cottonwoods crowned with good-as-gold moisture: